Flood defences for Poole get underway
1.5km of new infrastructure from Poole Bridge to Hunger Hill is to be constructed to prevent flooding to Poole town centre.
1.5km of new infrastructure from Poole Bridge to Hunger Hill is to be constructed to prevent flooding to Poole town centre.
Dorset Council has responded to comments claiming that blocked drains are the main reason for the recent flooding.
Because of flood levels, residents of the three sites are being advised to leave their homes as the water is rising.